Friday, July 3, 2009

Side of the House


Next we continued to peel sod and level out the side yard through to the front walkway. We set in
6-8"
thick 'fingers' of stone to create a border for the gardens which would line the outside edge of the path leading to the backyard. This area was then layered with about 2-3" of screenings and watered and tamped in several times.
We had the driveway paved in the meantime. The concrete patio slabs were removed from the front walkway and this area was levelled and screenings spread from the front porch to the top of
the driveway with areas on both sides for gardens.


No comments:

Post a Comment